The railway follows its primary alignment aside from the Quarter Mile Bridge around Teepookana. The old bridge was washed absent in a very flood in 1974, With all the new bridge just south of the original.[5] It is the proposal that this line be transformed to straightforward gauge to aid the transfer of mainland railway wagons immediate to Bell Ba